Materials and Logistics Coordinator at Hobark International Limited (HIL)

Posted on Tue 06th Feb, 2024 - www.hotnigerianjobs.com --- (0 comments)

Hobark International Limited (HIL) is the parent company of the Hobark group operating in the oil and gas industry. The company was incorporated in 1998, starting as a staffing agency based in Port Harcourt. Currently we have offices in 4 countries with our head office in Lagos.

We are recruiting to fill the position below:

Job Title: Materials and Logistics Coordinator

Location: Lagos
Job Type: Contract
Department/Division/Unit: Facilities Engineering and Major Projects

Job Objectives / Purpose of Job

  • Provide materials and logistics management services for an Integrated Facilities Upgrade Project for offshore Nigeria.
  • The Project includes a 200 MMscf/d Gas Compression and Export Facility, a replacement FPSO plus associated CALM buoy and PLEMS, Water Injection Facilities, two new wellhead platforms and modifications to a number of existing production and wellhead platforms, together with all associated pipelines.
  • Project budget is circa $600 million and overall schedule approx 2 years.
  • Location: Lagos, with visits to Company’s Port Harcourt and Calabar bases, fabrication yards and offshore construction sites.

Reporting Relationships:

  • Functionally Reports To: Materials and Logistics Supervisor
  • Administratively Reports To: Materials and Logistics Supervisor
  • Supervises: n/a

Working Relationships:
Internal:

  • Project Engineers / managers, Logistics (Personnel) Administrator and corporate Supply Chain Management dept.

External:

  • Equipment and Material suppliers, material supply and shipping contractors and fabrication and construction contractors.

Job Duties / Responsibilities / Accountabilities

  • Establish and maintain materials tracking registers, covering the ordering, expediting, inspection and delivery to worksite of all Project Materials.
  • Prepare and issue materials status reports, both regularly and on an ad-hoc basis, as requested by the Project Management Teams. Such reports to indicate estimated arrival dates versus ROS dates and highlight any potential shortages or delays.
  • Expedite the clearance and delivery of Project materials from point of landing to point of use.
  • Maintain a log of all materials-related documents (including inspection certificates and drawings), in conjunction with Company’s Document Controllers.
  • Physically inspect and check on the identification, segregation, condition and storage arrangements of Company-supplied materials, including those stored at Contractor’s premises. Ensure appropriate preservation measures are in place for materials stored for extended periods.
  • Ensure return of all unused and surplus materials to Company.
  • Carry out ad-hoc inspections and audits of suppliers and contactors materials management systems, including identification and storage / protection of Project materials, return of surplus materials etc.
  • Provide leave cover for Materials and Logistics Supervisor.

Key Performance Indicators/ Performance Goals:

  • Zero delays to the Project schedule due to unforeseen / unreported late deliveries of Company-provided equipment and materials.
  • Financial Dimensions: Nil

Job Specifications

  • Education Qualification: Degree in a Technical Discipline
  • Professional Qualification: n/a

Experience:

  • Minimum of 5 years in the Upstream Oil and Gas industry, with at least 3 years in a similar position
  • Age: 27+

Key Competencies Requirements:
Functional/ Technical:

  • Good knowledge and understanding of material tracking / reporting systems, as well as material and equipments specifications, codes, standards and inspection requirements.
  • Proficient in MSWord/Excel
  • Good verbal and written communication skills
  • Managerial: n/a
  • Behavioural: Organised, interactive, forward thinking and methodical

Work Cycle (Hours/ Days):

  • Monday - Saturday 0730 – 1630 hrs, with additional hours as operationally required
  • Rotation Contract position
  • Shift n/a

Travel Requirements:

  • None
  • 0 – 30 % YES
  • 31 – 60%
  • 61 – 100%

Application Closing Date
Not Specified.

Sorry, this listing is no longer open.