Manager-Construction at JAGAL Group

Posted on Mon 21st Mar, 2016 - www.hotnigerianjobs.com --- (0 comments)

JAGAL Group, is a leading Nigerian conglomerate with operations in the Oil & Gas, Construction and Manufacturing industries. The company has been growing successfully over the past 40 years, and has become a valuable and respected contributor to the development of the country's economy.

Jagal offers diverse career opportunities across all its business activities. The Group's broad range of industries and services offer rewarding prospects for various professional backgrounds and can satisfy ambitions for a successful future career.

We are recruiting to fill the position below:

Job Title: Manager-Construction


Ref Code: 579
Location: Lagos
Reporting to: GM Construction

Purpose
  • Responsible for coordinating, supervising, managing and delivering all construction activities and overall Mechanical Completion of the project in consonance with all contract specifications, requirements and project HSE/budgetary objectives.
Key aims and objectives:
  • Coordinate of review of Clients project construction drawings, specifications verifications and site survey prior to preparation of bill of engineering materials evaluation
  • Planning, scheduling and management of all project/construction effort and resources and Subcontractors to ensure economic and efficient utilization of resources to safely drive project workforce to achieve the project scope of work within budget and cost
  • Review of the project engineering designs, shop drawings and specifications issued by engineering department for constructability
  • Site verification of designs drawing specifications and condition survey and preparation of project scope of works for tendering purposes
  • Determine and address constructability issues of erection sequence, welding capability, access, crane usage/availability, lifting capabilities
  • Participate in the analysis of schedule feasibility with PMT
  • Determine adequate laydown/fabrication space, load out mechanism
  • Determine access availability for construction equipment, material and personnel
  • Interfaces with Contracts department, QA/QC, HSE as well as Engineering departments and both site and base production department in the preparation and execution of projects as appropriate
  • Provision of focused leadership to the project construction function and resource planning
  • Coordination of the review of design drawings and specification verifications and site survey prior to performance of bill of engineering materials evaluation
  • Planning and management of all construction effort and resources to ensure economic and efficient utilization of resources to safely achieve the project scope of work within budget and time
  • Ensure economic and efficient utilization of resources to safely achieve the projects scope of work within Company budget and timelines
  • Planning and control of manpower, equipment, materials and other resources requirements for imminent project challenges
  • Drive development and review of Company existing technical strategies for execution of new tasks as well as opening business
Prime Responsibilities and Duties
  • Ensuring the Contract Master Schedule is correct in regard to all construction activities
  • Ensuring that Engineering procedure sets of build sequence drawings in line with the contract master schedule
  • Ensuring that Engineering shop drawings are issued in line with the contract master schedule
  • Monitoring procurement to ensure all bulk material purchases are in line with CMS
  • Ensuring that Work packs are produced and issued in line with CMS
  • Ensuring that labor requirements are known and are secured in line with histogram from the CMS to allow activities can commence in line with CMS
  • Ensuring that HSE plan & procedures are adhered to by the  project workforce
  • Ensuring that the Construction Superintendent are fully aware of project requirements for Structural fabrication of the project structures
  • Making sure that construction supervisors on project are fully aware of objectives and milestones in order to complete the works in accordance with the CMS
  • Ensuring that all construction activities are controlled in accordance with QA/QC Inspection and Test Plans of the project
  • Ensuring subcontractors are managed with the PM to ensure the work is carried out to Project HSE & QA/QC requirements and in accordance to the CMS
  • Arrange and coordinate Completion meetings at the earliest stage possible to ensure the construction activities are complete and in line with Commissioning activities according to the CMS
  • Arrange and coordinate Pre Lift meetings of certain critical lifts to ensure all aspects of  Engineering, Quality and HSE have been undertaken to ensure the task is carried out after JSA and all pre checks have been signed off by relevant responsible persons
  • Arrange and coordinate Load out meetings with PM at an early stage to control all preceding activities leading up to the actual up to the actual Load Outs.
Other duties:
  • Participate in the proposal phase for new work as required.
Key interfaces:
  • QA/QC, HSE, PMT and all Engineering disciplines
  • Vendors/Suppliers
  • 3rd party Companies
  • Stakeholder
Job Requirements
Person:
  • Should have Engineering Degree, Technical School Diploma or Equivalent Work Experience
  • At least 20+ years of experience in a Project Structural, Piping and Mechanical Construction Work