Egbin Power Plc. PowerUp Internship Programme (July - December) 2026

Posted on Fri 12th Jun, 2026 - www.hotnigerianjobs.com --- (0 comments)

Egbin Power Plc. Lagos is one of the biggest additions to the electricity industry in Nigeria. Often seen as the biggest single generating power station in Sub-Saharan Africa, it was built to meet the every rising demand for electricity in Lagos and its environs.

Following the nation’s privatization exercise, Sahara, through its power division, Sahara Power Group and sundry affiliations, acquired the 1320 MW installed capacity Egbin Power Plant. We are working towards deploying a minimum of 5,000 MW of electricity generation over the next five years.

Applications are invited for:

Title: Egbin PowerUp Internship Programme (July - December) 2026

Location: Lagos
Job type: Full-time

Description

  • Egbin PowerUp Internship Experience equips students to bridge the gap between theoretical knowledge and practical application, also enhancing their skills, building their confidence, and sharpening their creativity and problem-solving abilities.
  • This Internship runs from July - December 2026. 

Field of Study

  • Mechanical Engineering
  • Electrical Engineering
  • Mechatronics Engineering
  • Chemistry/Chemical Engineering
  • Computer Science/ Computer Engineering.

Eligibility

  • Students on Second Class (2:1) or its equivalent as at the time of submitting the application.

Application Closing Date
Not Specified.

How to Apply
Interested and qualified candidates should:
Click here to apply online